Agenda for Monday, August 14th (5pm to 7pm (CDT))

14 Aug
2006
14 Aug
'06
4:09 a.m.
The following is the proposed agenda for the OGSA-WG teleconference on Aug. 14th Monday from 5pm to 7pm (CDT). The dial-in number for Monday; US: +1 718 3541071 (New York) or +1 408 9616509 (San Jose) UK: +44 (0)207 3655269 (London) Japan: +81 (0)3 3570 8225 (Tokyo) Complete dial-in information: http://tinyurl.com/eg48j PIN: 4371991 Screen share service will be provided. URL: http://ogsa.glance.net Session key: 0814 See more explanation: http://www-unix.gridforum.org/mail_archive/ogsa-wg/2004/06/msg00077.html 1) Early discussion (10 min) Note taker assignment Roll call Telecon minutes approval (Aug. 10th), if available Action Items status review (see bottom of this email) Agenda bashing 2) OGSA Roadmap (Chris, 40 min) > A slightly edited version of the OGSA Roadmap v1.1 has been uploaded > to GridForge, at: > > https://forge.gridforum.org/sf/go/doc13733?nav=1 > > At this point, all I've done is added a comment or two and done some > rewriting of the introductory section. Please feel free to download > and read it if you'd like to discuss or savage my changes on > tomorrows call. 5) Wrap up (10 min) AOB <*NEXT CALL*> Aug. 17 (Thu): Info/data model (Ellen and Fred), EMS and data joint scenarios (Allen and Steven) Aug. 21 (Mon): Aug. 24 (Thu): CDDLM joint (Jun, Dejan, and Hiro) Aug. 28 (Mon): Security (Takuya and Frank) Aug. 31 (Thu): EMS scenarios (Andreas and Steven) Sept. 4 (Mon): No call (Labor Day) Sept. 7 (Thu): Roadmap (Chris), GGF18 prep (Tom and Hiro) Telecon schedule: https://forge.gridforum.org/projects/ogsa-wg/document/telecon_schedule/ <*ACTION ITEMS*> [Not sure if there were updates on the Aug.10th call.] > > From Aug. 3 call AI-0803a: Hiro to look into an option for a second EMS/Data call on Sep 7. Tentative; needs confirmation with likely participants. AI-0803c: Ellen to book the IBM facility on Thursday afternoon AI-0803d: Hiro to divide GGF18 B2B F2F survey into three periods: Thursday afternoon, Friday morning and afternoon. AI-0803e: Jun will provide an example of the CDL mechanism and why using ID/IDREF is not a good idea. AI-0803f: Jun will update the CDL document to remove the Environment variables > > From July 20 F2F - Andreas and Hiro to revise the EMS scenario document (i.e. examples) so that proposal 2 is fulfilled + Andreas will merge Hiro's updates into the next draft - EGR-WG (Ravi) will contact Geoffrey Fox and invites him to contribute use cases. - Andreas to go through the minutes and formulate a reply mail to Geoffrey on each artifact covered in these minutes. <postponed> - Steve McGough & Andreas to do a mapping from the current JSDL elements / terminology into the new information model structure (Proposed split into Description and Requirements) (from July 18th F2F, postpone until Aug. 17) -- Andreas Savva Fujitsu Laboratories Ltd

14 Aug
14 Aug
8:19 a.m.
-----BEGIN PGP SIGNED MESSAGE----- Hash: SHA1 For the roadmap discussion, please also take a look, if you get a chance, at the contact tracker wiki on gridforge, at: https://forge.gridforum.org/sf/wiki/do/viewPage/projects.ogsa-wg/wiki/ OGSARoadmap I may also go through these quickly on the call tomorrow to make sure that we have the correct contacts for everyone On Aug 13, 2006, at 9:09 PM, Andreas Savva wrote: > The following is the proposed agenda for the OGSA-WG teleconference on > Aug. 14th Monday from 5pm to 7pm (CDT). > > The dial-in number for Monday; > US: +1 718 3541071 (New York) or > +1 408 9616509 (San Jose) > UK: +44 (0)207 3655269 (London) > Japan: +81 (0)3 3570 8225 (Tokyo) > Complete dial-in information: http://tinyurl.com/eg48j > PIN: 4371991 > > Screen share service will be provided. > URL: http://ogsa.glance.net > Session key: 0814 > See more explanation: > http://www-unix.gridforum.org/mail_archive/ogsa-wg/2004/06/ > msg00077.html > > 1) Early discussion (10 min) > Note taker assignment > Roll call > Telecon minutes approval (Aug. 10th), if available > Action Items status review (see bottom of this email) > Agenda bashing > > 2) OGSA Roadmap (Chris, 40 min) > >> A slightly edited version of the OGSA Roadmap v1.1 has been uploaded >> to GridForge, at: >> >> https://forge.gridforum.org/sf/go/doc13733?nav=1 >> >> At this point, all I've done is added a comment or two and done some >> rewriting of the introductory section. Please feel free to download >> and read it if you'd like to discuss or savage my changes on >> tomorrows call. > > 5) Wrap up (10 min) > AOB > > <*NEXT CALL*> > Aug. 17 (Thu): Info/data model (Ellen and Fred), > EMS and data joint scenarios (Allen and Steven) > Aug. 21 (Mon): > Aug. 24 (Thu): CDDLM joint (Jun, Dejan, and Hiro) > Aug. 28 (Mon): Security (Takuya and Frank) > Aug. 31 (Thu): EMS scenarios (Andreas and Steven) > Sept. 4 (Mon): No call (Labor Day) > Sept. 7 (Thu): Roadmap (Chris), GGF18 prep (Tom and Hiro) > > Telecon schedule: > https://forge.gridforum.org/projects/ogsa-wg/document/ > telecon_schedule/ > > <*ACTION ITEMS*> > > [Not sure if there were updates on the Aug.10th call.] > >>> From Aug. 3 call > AI-0803a: Hiro to look into an option for a second EMS/Data call > on Sep 7. Tentative; needs confirmation with likely > participants. > AI-0803c: Ellen to book the IBM facility on Thursday afternoon > AI-0803d: Hiro to divide GGF18 B2B F2F survey into three periods: > Thursday afternoon, Friday morning and afternoon. > AI-0803e: Jun will provide an example of the CDL mechanism and why > using ID/IDREF is not a good idea. > AI-0803f: Jun will update the CDL document to remove the Environment > variables > >>> From July 20 F2F > - Andreas and Hiro to revise the EMS scenario document (i.e. examples) > so that proposal 2 is fulfilled > + Andreas will merge Hiro's updates into the next draft > - EGR-WG (Ravi) will contact Geoffrey Fox and invites him to > contribute use cases. > - Andreas to go through the minutes and formulate a reply mail to > Geoffrey on each artifact covered in these minutes. > > <postponed> > - Steve McGough & Andreas to do a mapping from the current JSDL > elements / terminology into the new information model structure > (Proposed split into Description and Requirements) > (from July 18th F2F, postpone until Aug. 17) > > -- > Andreas Savva > Fujitsu Laboratories Ltd > <OGSA Teleconference.ics> Chris Jordan Data Reliability Manager San Diego Supercomputer Center ctjordan@sdsc.edu 858.534.8347 "Mother, I feel so far away from everything." - The Enigma of Kaspar Hauser -----BEGIN PGP SIGNATURE----- Version: GnuPG v1.4.1 (Darwin) iD8DBQFE4DILPCVtcXn6kg8RAnXCAKDLo+PMAswu8ziWGWJf/p4RY0264wCffFuL U1dk/ts1HjDd6ABfjow8/Qg= =wE+H -----END PGP SIGNATURE-----
6848
Age (days ago)
6848
Last active (days ago)
1 comments
2 participants
participants (2)
-
Andreas Savva
-
Christopher Jordan