Present
Steven Newhouse (Microsoft)
Steve McGough (Imperial College)
Glenn Wasson (UVa)
Blair Dillaway (Microsoft)
John Ehrig (OGF)
Marty Humphreys (UVa)
Chris Smith (Platform)
Agenda
1.
OGF IPR Notice
2.
Agenda Bashing
a. Will
there be activity at OGF21?
b. What
is the purpose of this activity?
1. To
write the experiences document (main priority)
2. Explore
extensions for activity credential & data staging (secondary – but significant
targets)
3. Explore
the use of an extended information model around the GLUE schema (lower priority
than 1 & 2)
3.
Who will be involved?
a. Please
respond to questions in advance (http://www.ogf.org/pipermail/ogsa-hpcp-wg/2007-August/000390.html)
1. GridSAM
2. Microsoft
HPC
3. UVa
– GCG
4. UVa
– VCGR
5. Platform
(LSF)
6. Altair
(PBS)
7. Others
TBC: Globus, Unicore, CROWN & gLite
Action: Wiki page on GridForge to hold the information (http://forge.ogf.org/sf/wiki/do/viewPage/projects.ogsa-hpcp-wg/wiki/HomePage)
. All to upload information requested in email onto wiki page which has a link
to the compliance checker, which will be active once firewall issues have been
resolved.
b. Demonstration
space at SC07?
Those present: Microsoft (HPC & UVa - GCR), Platform,
Altair, UK e-Science (TBC)
No dedicated space: UVa - VGCR
4.
Procedure
a. HPCP
UVa: Two implementations: One has username & password,
one has X.509 certificate.
Go for pairwise application demonstrations rather than a
single ‘big’ demo.
b. Additional
areas for JSDL & BES specifications
BES: Vector length
UVa: Greater than 1 throws fault.
Platform: Should be able to fix
implementation to handle longer vector lengths
JSDL: HPCP does not use resources and POSIXApplication model.
c. Supported
security models
Host both types endpoint: UVa, Platform (probably), GridSAM
(probably), Microsoft (probably)
5.
Experiences document
a. Review
outline (http://www.ogf.org/pipermail/ogsa-hpcp-wg/2007-August/000389.html)
Initially, try out the compliance checker and once the
implementation is up and running, post the endpoint for doing N to N
interoperability checks.
Action: Run your endpoint against UVa compliance checker by
end of the month. Glenn to send out email once firewall issues resolved. Please
send feedback as issues around the triggered faults may need to be tweaked.
Goal is to collect experiences as we go so that a PUBLIC draft of the
experiences document can be made available at SC07.
Extensions:
Activity Credential: Specification is solid. Has been
implemented. Authentication credential for the application NOT for the service
endpoint. For use in data staging or meta-scheduling.
Data Staging: Specification is less mature. Not been
implemented yet. Relies on activity credential extension to provide a
credential if data is then going to be staged out from the execution host.
6.
Next Call: Same time in 2 weeks
7.
Any Other Business
a. OGF21
Meeting. HPCP WG 11am Monday 15th October 2007. Consider the maturity
of the interoperation activity on later calls to see if we do a mini demo at
OGF21. John would need minimum of 2 weeks lead time for PR. More notice needed
for industry invites.