9 Jul
2006
9 Jul
'06
9:31 p.m.
hello, As far as I know, the specification doesn't state that job status should be reflected in the very next drmaa_job_ps() call after changing it with drmaa_control(). Is it true, or did you actually intent to make drmaa_control() synchronize the job status change? -- Piotr Domagalski