22 Mar
2010
22 Mar
'10
3:02 p.m.
SGE tends to look at the 5-minute average, although any can be configured. You could solve it the same way we did for SGE -- offer three: machineLoadShort, machineLoadMed, machineLoadLong. Daniel On 03/22/10 06:05, Peter Tröger wrote:
Hi,
next remaining thing from OGF28:
We support the determination of machineLoad average in the MonitoringSession interface. At OGF, we could not agree on which of the typical intervals (1/5/15 minutes) we want to use here. Maybe all of them ?
Best, Peter.
-- drmaa-wg mailing list drmaa-wg@ogf.org http://www.ogf.org/mailman/listinfo/drmaa-wg