ACS use case description for SDD TC

Folks, Attached is the proposed ACS use case description we reviewed today. Please point if there is any update needed. Color code switched as the green: yes, yellow: possibly. Change history removed. -Keisuke

My update for requirement 1.3-a (See attached file: d2ACSreqsForSDDinputtws.doc) Thomas W. Studwell Senior Technical Staff Member, Autonomic Computing Architecture IBM Software Group B140/Bldg 500 4205 S Miami Blvd, Durham, NC 27703 (919) 254-7574 Fax: (919) 254-7628 Mobile: (919) 619-1038 studwell@us.ibm.com "Things should be made as simple as possible, but not any simpler." Albert Einstein (1879-1955) "Keisuke Fukui (on the road)" <kfukui@labs.fuji To tsu.com> acs-wg@ggf.org Sent by: cc owner-acs-wg@ggf. org Subject [acs-wg] ACS use case description for SDD TC 08/02/2005 01:00 AM Folks, Attached is the proposed ACS use case description we reviewed today. Please point if there is any update needed. Color code switched as the green: yes, yellow: possibly. Change history removed. -Keisuke [attachment "d2ACSreqsForSDDinput.doc" deleted by Thomas Studwell/Raleigh/IBM]

Attached is a proposed short info-brief for the OGSA F2F for us to review today at the F2F. -- -- Michael Behrens R2AD, LLC Cell: 571-594-3008
participants (3)
-
Keisuke Fukui (on the road)
-
Michael Behrens
-
Thomas Studwell